Introduction
In March 2010, the North Burleigh Water Treatment Plant in Bismarck, North Dakota, installed a Pinnacle Summit™ Series ozone system. This case study explores the impact of our technology on their water treatment operations, highlighting the significant improvements in water production, cost savings, and operational reliability.
Background
The North Burleigh Water Treatment Plant needed to replace older technology with a more reliable and efficient system that could meet real-time demand for ozone production and delivery. They chose Pinnacle Ozone Solutions for our reputation for innovation, reliability, and cost-effectiveness.
Implementation
- System Installed: The plant installed a Summit™ Series ozone system, designed to provide real-time ozone production and delivery. This system includes advanced features such as QuadBlock® technology, which ensures precise control and high reliability.
- Operational Hours: Since its installation, the system has operated for over 80,000 hours with minimal downtime. This impressive operational record underscores the system’s reliability and efficiency.
- Maintenance: The system requires only routine annual preventative maintenance, which can be completed in just a few hours. This minimal maintenance requirement further enhances the system’s overall reliability and uptime.
Results
- Increased Production: The implementation of the Pinnacle ozone system resulted in a 64% increase in finished water production. This significant boost in capacity has allowed the plant to meet growing demand more effectively.
- Cost Savings: The plant achieved a 20% reduction in unit operating costs, demonstrating the cost-effectiveness of Pinnacle’s advanced ozone technology.
- Reliability: The system has maintained over 99.9% uptime, ensuring consistent water quality and reliability. This high level of reliability is crucial for municipalities, as it ensures a continuous supply of safe drinking water.
Success Stories
The North Burleigh Water Treatment Plant’s success is a testament to the effectiveness of Pinnacle’s ozone systems. The plant’s ability to increase water production and reduce costs has set a benchmark for other municipalities looking to upgrade their water treatment infrastructure.
Client Feedback
The feedback from the plant’s operators has been overwhelmingly positive. They have praised the system’s ease of use, low maintenance requirements, and significant operational improvements. The plant’s success story has also been shared with other municipalities, demonstrating the benefits of adopting advanced ozone technology for water treatment.
Conclusion
The North Burleigh Water Treatment Plant’s experience showcases the transformative impact of Pinnacle’s ozone systems. Our technology not only enhances water production but also delivers significant cost savings and operational reliability. As municipalities face increasing demands for safe and reliable water treatment, Pinnacle Ozone Solutions stands ready to provide the advanced solutions needed to meet these challenges. Stay tuned for more case studies and insights into our cutting-edge ozone technology.
Recent posts