REDUCE EQUIPMENT COORDINATION
Plan Around a More Integrated System
System Architecture
Everything You Need, Engineered into One Skid
The Peak 5X Plus brings major ozone-generation and delivery components together on a single skid. For projects where equipment coordination and available installation space are important considerations, this integrated approach helps simplify system planning and implementation.

HOW THE SYSTEM WORKS TOGETHER
See How the Major Components Support Treatment
The Peak 5X Plus integrates the major components needed to supply oxygen, generate ozone, manage cooling, and deliver ozone into the treatment stream. Final component selection depends on the project configuration.
Compressor
Oil-free, sized for demand.
Dry Air Tanks
Stable operation & pressure.
Oxygen Concentrator
High-purity oxygen supply.
Oxygen Storage Tank
Consistent flow buffering.
Ozone Generator
High-performance, modular design.
Chiller System
Optimized cooling & protection.
Ozone Injection Skid
Stable operation & pressure.
PLC + HMI Controls
Automation, monitoring, SCADA-ready.
Water In/Out Connections
Stable operation & pressure.
Discover More Pinnacle Insights
- News & PressPinnacle Ozone Solutions has published a new case study and technical white paper on the City of Sanford's Auxiliary Water Treatment Plant 2 (WTP 2), a 4.6 MGD facility in Sanford, Florida, that treats groundwater containing both hydrogen sulfide (H₂S) and bromide.

- WhitepapersNovember 6, 2026

- Case StudiesNovember 6, 2026




