Inside Ozone System Controls, PLC and HMI
What actually makes an ozone system run as one engineered package? In this episode of Pinnacle Academy, host Sannel Patel goes inside the controls with Ely Wineland, Operations Manager and Principal Mechanical Engineer, and Quentin Washington, Senior Ozone Control Systems Engineer.
They follow a control system from the first P&ID to the I/O list, electrical schematic, PLC logic and operator HMI. Along the way they explain digital and analog I/O and how 4–20 mA signals work. They also cover the difference between permissives and interlocks, and why mechanical, electrical and controls design have to be worked out together.
Quentin explains Pinnacle’s three operating modes (fixed, dose and sensor), what makes a good HMI for operators, and what data gets shared with a plant’s SCADA system. Ely covers designing for 15+ years of service, ambient ozone safety alarms, and what Pinnacle’s factory testing checks before a system ships.
The episode wraps up with advice for consulting engineers on what to define early in a project: turndown, redundancy, scope of supply and network interfaces. Settling these up front helps start-up and commissioning go smoothly.
Related Videos
Related Videos